On this page you can find the ongoing projects of the Premises Management Office.
The project aims to provide the City Centre Comprehensive School with functional, adaptable and modern teaching facilities for over 1,000 pupils. The facilities will be concentrated into a whole that comprises the current Keskuskoulu, the building to be renovated at Kauppapuistikko 22, and a building at Raastuvankatu 33 that will be demolished and replaced by a new building. The planning phase started in 2025.
The new 7-group day care centre in Palosaari (128 children) will be located in the premises of the main building of Palosaari School. The new day care centre is scheduled to begin operations during 2026. When operations move into the new premises, the old day care building at Perämiehenkatu 20 may be demolished and the plot released for other use.
The Early Childhood Education and Care services in the Gerby and Isolahti areas are currently distributed in small separate units. The number of early childhood education places in the Gerby area is insufficient to serve families with children in both the short and long term. A needs assessment approved in 2023 proposes a new 8-group day care centre. The project plan will be processed during 2025.
The planning for the renovation will be initiated in 2025. During the planning and related studies, the scope of the renovation needs will be determined.
The needs assessment has been approved and it was decided to replace the V-building’s facilities with new construction, with the old school buildings serving as temporary premises until the teaching facilities are completed. The project plan is targeted to be completed in summer 2025.
Barracks area troop buildings number 13 and 14 will be renovated to meet the space requirements according to the Early Childhood Education and Care needs assessment. The project will also take into account preserving the buildings’ architectural-historical values. The project will be completed during 2026.
Due to the increase in the number of pupils requiring demanding special support, the school’s space needs have grown. The needs assessment has also examined the space requirements for after-school activities and youth facilities. Planning will be completed in 2025, after which the construction phase will begin.
Through the renovation programme the Premises Management Office ensures the preservation of the value of the property assets. Implementing the renovation programme is a significant part of the proactive maintenance of the properties. The programme consists of approximately 100 separate repair projects each year.
The aim is, through the programme’s financing, to also carry out 1–3 larger renovation projects. The duration of these projects is typically 2–3 years. The renovation programme’s projects include, among other things, replacements of building components that have exceeded their technical service life, works that improve indoor air quality and energy efficiency, and measures that promote the safety and accessibility of building users. In addition, through the programme it is possible to respond to changes in the operating environment that require modifications to the premises needed for the city’s service production.