The local detailed plan earmarks a block area, in accordance with the master plan, for industrial buildings. The draft local detailed plan was on display in autumn 2025. A nature survey of the planning area was carried out in 2024 and a stormwater study in 2026. The aim is a legally valid local detailed plan in early 2027.
Progress of the planning process
1
Initiation
13.12.2023
2
Draft and the Participation and Assessment Plan
28.11.-11.12.2025
3
Proposal
4
Approval
The local detailed plan has not been approved
5
Legally valid
The local detailed plan is not legally valid