Koulukatu 56-58 (ak1122)

A two-story yellow wooden house in a winter landscape with a lot of snow and a tree in the foreground.

The local detailed plan amendment is being prepared for the plot at Koulukatu 56–58. The plan study will examine what uses the area is suitable for once daycare operations have ended and what kind of infill construction can be carried out on the plot.

The local detailed plan study will examine:

  • changing the intended use of the plot
  • possibilities and extent of infill construction

The objective is to find a solution that fits the scale of the area and the valuable environment.

The change area is located near a wooden barracks area that is significant in terms of cultural history and architectural value. The plot at Koulukatu 56–58 also contains protected wooden buildings dating from the 19th century.
The starting point for the planning is to integrate the new construction with the old building stock.

Current daycare activities are moving away from the area, freeing the properties for new uses. A central objective of the planning work is to define the scale and form of construction so that new and old form a functional and pleasant whole. It is proposed that the old buildings be rezoned for residential use.

A market dialogue has been held about the planning area. In the draft phase it will also be examined whether Rantakatu 23 can be included in the plan area.

The aim is to put the draft plan on display during 2026. The project’s schedule will be clarified as the design progresses.

When the draft local detailed plan is put on display, you can review the plans and express your opinion. The display period and instructions for participation will be published on this page.

The aim is to put the draft plan on display during 2026. The project’s schedule will be clarified as the design progresses. The local detailed plan for Koulukatu 56–58 will examine a new use for the plot and infill construction within a valuable cultural environment.

Progress of the planning process

1

Initiation

16.8.2023

2

Participation and assessment plan

16.-29.8.2023

3

Draft

4

Proposal

5

Approved

6

Legally valid

The local detailed plan is not legally valid