Vaskiluoto employment area (ak1149)

Satellite image of Vaskiluoto area in Vaasa showing various planning areas and buildings. The image marks EPV Energia Oy planning area, Wärtsilä Finland Oy planning area, Vaskiluoto power plant, Wärtsilä Sustainable Technology Hub, Vaasa harbor, and several roads such as Frilundintie and Kaartlentie.

THE DETAILED PLAN PROPOSAL IS ON DISPLAY 6.11.-7.12.2026.
The proposal with attachments can be found at the bottom of this page under the heading “Proposal 6.11.-7.12.2026”. Background reports for the detailed plan can be found at the bottom of the page under the heading “Background reports”.

You may submit objections to the detailed plan proposal no later than 7.12.2026:

  • by email: kaavoitus@vaasa.fi
  • to: City Planning, P.O. Box 2, 65101 VAASA,
  • or to the visiting address: Kirkkopuistikko 26A

You can also express your opinion by answering the map survey available on this website.

The detailed plan work was initiated at the request of Wärtsilä Finland Oy and EPV Energia Oy.
The detailed plan will secure the operating conditions of these companies. At the same time, it will ensure that the living conditions in the Suomen Sokeri area and the operating conditions of companies and associations operating in the nearby area do not deteriorate.

A new infill area is being zoned for the water area north of the power plant, where staff facilities and buildings serving community technical maintenance can be located. The new building may have a maximum floor area of 2,400 square metres and a maximum height of three storeys. If implemented, the building will replace the power plant area’s current staff facilities.

The detailed plan will facilitate the organisation of parking for the Wärtsilä Technology Centre by concentrating parking close to the technology centre. Most of the area between Teollisuuskatu, Frilundinpolku and Kaarlentie will be reserved for this purpose. The previously planned parking garage location near Frilundintie will be removed. A new location for the parking garage will be designated near Kaarlentie.

The detailed plan includes provisions on urban greenery and stormwater management. Quality requirements regarding façades and lighting will be set for buildings.

The detailed plan target timetable:
Spring 2027: the zoning plan enters into force

Progress of the planning process

1

Initiation

3.12.2025

2

Participation and assessment plan

11.12.2025-9.1.2026

5

Approval

The zoning plan has not been approved

6

In force

The zoning plan is not in force