The local detailed plan work was related to Wärtsilä’s technology centre Sustainable Technology Hub (www.vaasa.fi/ak1091). A logistics centre was zoned for the technology centre and, at the same time, the outdated local detailed plan for the surrounding industrial plots was updated. Street arrangements were also carried out. Teollisuuskatu was closed and replaced by a new connection from Reininkatu via Kaarlentie to the technology centre and the Suomen Sokeri area. Pedestrian, cycling and public transport connections were also improved.
The local detailed plan became legally valid in 2020 and the logistics centre was taken into use in 2022.
The planning materials are available in Finnish and Swedish.
Progress of the planning process
1
Initiation
13.3.2019
2
Participation and assessment plan
22.8.-6.9.2019
3
Draft plan
1.-14.10.2019
4
Plan proposal
18.12.2019-17.1.2020
5
Approval
Approved by the City Council on 23.03.2020